A new 3 layer felt system installed in Ashford. After the current flat roof’s life had come to an end, we stripped back the flat roof to the joists, re boarded and installed a new 3 layer felt system.

Previous
Previous

The old flat roof was only done less then 2 years ago and was failing everywhere. After our client c

Next
Next

A small extension using a Delta interlocking Concrete roof tile and a Mini Stonewold concrete interl